02International rail freight· Wagon · group

Wagonload rail freight from China

single wagons and wagon groups

  1. Request
  2. Scheme
  3. Loading
  4. Transfer
  5. Unloading

Wagonload shipments from China are for cargo that won't go in a container because of weight, size or nature: rolled steel, timber, machinery, bulk, large lots of packaged goods. We select a covered wagon, flatcar or open wagon and ship it singly or as a group.

The main risks in wagonload are securing and the transfer at the 1435/1520 mm gauge break. We prepare the securing scheme for the cargo and get it approved before loading, and keep the border transfer under control.

Tell us the route, cargo and container type.
02

Specification

updated 2025-Q4 · form ATF-RAIL-WAGON-2025

Specification · Wagonload from China. Standard terms · rate and timing for a given date are set in the order to the contract

Service

Format
single wagon or wagon group
Wagons
covered, flatcar, open wagon
Options
out-of-gauge, insurance, customs

Terms

Wagon supply
3–7 days after approval
Documents
SMGS and securing scheme included
Currency
USD / RUB

Logistics

Origin
loading and securing per scheme
Border
1435 → 1520 transfer
Destination
release, unloading, wagon return

Price

Base
rate per wagon: railway tariffs + wagon
Extras
transfer, idle time, out-of-gauge — on request
03

Service flow

5 steps
  1. 01

    Request and wagon choice

    We collect weight, dimensions, packing and cargo code; select the wagon type, check the loading gauge and quote: railway tariffs, border transfer and wagon provision.

    1–2 days
  2. 02

    Plan and securing scheme

    We place the loading request in the Chinese railway plan, draw up the loading and securing scheme and, for out-of-gauge cargo, obtain approvals from every railway on the route.

    2–5 days
  3. 03

    Supply and loading

    The wagon is placed for loading, cargo is stowed and secured per the scheme, covered wagons are sealed; we issue the SMGS note and export clearance is done in China.

    3–7 days for supply
  4. 04

    Border and transfer

    At the border station the cargo is transferred from 1435 mm wagons into 1520 mm wagons, or bogies are exchanged; we check securing after transfer and track the wagon to destination.

    by distance + 1–3 days at the border
  5. 05

    Release and unloading

    We file the import declaration (DT), settle the documents at the destination station, unload at the public yard or the consignee's private siding and return the empty wagon to its operator.

    1–3 days
04

Problems

3 situations
01 · Problem

The wagon is refused for carriage: securing does not meet the technical conditions or the axle load is exceeded.

→ ATF solution

We calculate the stowage before loading, prepare a cargo-specific securing scheme and get it approved by the railway in advance.

02 · Problem

During the border transfer cargo gets damaged, packages go missing or lots from different shipments get mixed up.

→ ATF solution

One party responsible for the whole route, border transfer included: we reconcile packages and marks, request transfer reports and check securing in the 1520 mm wagon.

03 · Problem

The bill grows because of wagon idle time during loading and unloading and unexpected station charges.

→ ATF solution

Before departure we fix the rate, the allowed loading and unloading time and the charge for excess idle time in the specification.

05

Documents

2 blocks

The basic set for a wagonload shipment from China. Rail uses FCA, CPT or DAP — the sea terms FOB and CIF do not apply to a wagon. Out-of-gauge cargo and non-standard securing require a separate set of approvals.

Incoterms

FCA
cargo loaded in the wagon at the origin station
CPT
carriage to the destination station paid by the seller
DAP
delivered at destination station or warehouse, import clearance excluded

Documents

Contract
foreign trade contract with its specification
Invoice
commercial invoice
Packing List
packages and gross/net weight per wagon
SMGS note
per wagon or per wagon group (with a wagon list)
Securing scheme
loading and securing drawing approved by the railway
Out-of-gauge
dimensions, centre of gravity, approvals of all railways en route
06

FAQ

6 questions

When the cargo does not fit a container by size or weight — long loads, machinery, rolled steel, bulk. A wagon takes 68–71 t against roughly 26–28 t payload of a 40-foot container, and needs no container stuffing. For ordinary packaged lots under 20–25 t a container is usually simpler.