A logistics tender only delivers if the rates are comparable. We prepare an RFQ by lot, collect bids in a single all-in template and check where money is usually lost: validity, free time, 'as incurred' surcharges and the conversion rate.

Choosing a logistics contractor is not only about price: the lowest rate often ends in failed bookings and liability disputes. We recommend a primary and a backup provider for each lot.

Tell us the route, cargo and container type.
02

Specification

updated 2025-Q4 · form ATF-CONSULTING-TENDER-2025

Specification · Logistics tender. Standard terms · lot structure and tender timing are agreed to fit your volume

Service

Type
tender for transport and forwarding
Lots
sea, rail, road, air, customs, warehousing
Options
quarterly rate review

Terms

Timing
about 3–5 weeks
Rounds
1–2, with a shortlist
Currency
USD / RUB

Stages

Stage 1
lots, bidders, RFQ
Stage 2
collecting and normalising bids
Stage 3
recommendation and draft SLA

Price

Base
by number of lots and bidders
Extras
SLA performance monitoring — on request
03

Service flow

5 steps
  1. 01

    Lots and requirements

    We split volume into lots by lane and mode, fix the monthly forecast, container types, special requirements (DG cargo, temperature control) and the rate validity period.

    3–5 days
  2. 02

    Bidders

    We draw up the bidder list — your current contractors plus new ones — and check them: company details, lane experience, liability and insurance.

    2–3 days
  3. 03

    Collecting bids

    We send out the RFQ with a single template, answer bidder questions equally for all, and collect offers by the deadline.

    1–2 weeks
  4. 04

    Comparison and second round

    We bring rates to an all-in basis and check validity, free time, 'as incurred' charges, conversion rate and payment terms. If needed, we run a second round with a shortlist.

    3–5 days
  5. 05

    Recommendation and SLA

    We hand over the comparison table and recommendation: primary and backup contractor for each lot, a draft SLA and terms worth fixing in the contract.

    1–2 days
04

Problems

3 situations
01 · Problem

One bidder quotes freight only, another door delivery, a third excludes local charges; the rates cannot be compared.

→ ATF solution

One template: every item line by line and an all-in total in one currency; non-compliant replies are sent back for revision.

02 · Problem

After the first shipments the tender winner starts adding surcharges and rolling bookings.

→ ATF solution

The SLA fixes the list of permitted surcharges, the booking confirmation deadline and the procedure in case of failure; a backup contractor is kept for each lot.

03 · Problem

The rate is attractive, but it is valid for two weeks and tied to the exchange rate on the payment date.

→ ATF solution

We compare rates taking validity and conversion terms into account, not just the figure in the table.

05

Documents

2 blocks

Tender documents. The Incoterms rule decides which part of the chain you actually buy — that shapes the lot and the rate template.

Incoterms

EXW / FCA
the lot includes the origin leg and export clearance
FOB
tender covers freight and destination services; origin charges are on the seller
CIF / CFR
only destination charges, haulage and Russian clearance go to tender

Documents

RFQ
request for quotation: lots, volumes, equipment type, period, requirements
Rate template
freight and every surcharge line by line, all-in total, currency, validity
Bidder questionnaire
company details, lane experience, liability and insurance, GOSLOG registry entry
Draft SLA
quote and booking turnaround, documents, statuses, claims procedure
06

FAQ

6 questions

Split the volume into lots by lane and mode, send an RFQ with a single rate template, bring replies to an all-in basis and assess not only price but validity, free time, liability and SLA commitment. The whole process usually takes 3–5 weeks.