09Sea container freight· Through rate

Multimodal transport from China:

Sea+Rail and Sea+Road · a through rate under one contract

  1. Booking
  2. Ocean leg
  3. Port & customs
  4. Rail or road
  5. Delivery

Multimodal transport from China means sea to Vladivostok, Vostochny or Nakhodka, then rail or road to the consignee's terminal or warehouse, with no break in responsibility at the transfers. For Moscow, the Urals and Siberia the main option is sea + rail: the container leaves the port by train, and the total to Moscow is typically 25–35 days.

You get a through sea + rail rate, one contract and single tracking — instead of coordinating a carrier, a port forwarder and a rail operator. We issue a through B/L or FBL, decide where customs clearance is best — at the port or at an inland office under transit — and watch container free time along the whole route.

Sea+Rail · Sea+RoadThrough rateThrough B/L · FBL
Tell us the route, cargo and container type.
02

Specification

updated 2026-Q1 · form ATF-SEA-MMODAL-2026

Specification · Multimodal transport. Standard terms · route, rate and timing are confirmed per shipment

Contract

Service type
Multimodal · door-to-door
Schemes
Sea+Rail · Sea+Road
Rate
single through rate
Liability
one operator for the route
Settlement currency
USD · CNY · RUB

Scheme and documents

Transport document
through B/L / FBL
Transfer ports
Vladivostok · Vostochny · Nakhodka
Inland leg
rail or road
Customs
at the port or inland under transit
Tracking
along the whole chain

Transit time

Booking & positioning
1–3 days
Ocean leg
7–14 days from China
Port & rail dispatch
2–7 days
Transit to Moscow
about 25–35 days
03

Service flow

5 steps
  1. 01

    Building the through route

    For the destination address we build a Sea+Rail or Sea+Road route: choose the port of loading, the transfer port (Vladivostok, Vostochny, Nakhodka) and the inland mode, and calculate a through rate.

    1–2 days
  2. 02

    Booking and through document

    We confirm the vessel slot and the rail dispatch (the rail transport request), and issue a through B/L or FBL under single responsibility.

    1–3 days
  3. 03

    Ocean carriage

    Ocean carriage on the liner schedule: China to the Primorye ports typically 7–14 days. We warn about port-call changes and roll-overs.

    7–14 days
  4. 04

    Port, customs and transfer

    At the port we clear the cargo under an import declaration (DT) or open customs transit to an inland customs office, then put the container on a rail flatcar or truck with no re-documentation.

    2–7 days
  5. 05

    Inland leg and delivery

    We deliver to the inland terminal, 3PL warehouse or consignee's door: rail from Vladivostok to Moscow typically takes 10–14 days. We return the empty and issue closing documents for the whole chain.

    per route
04

Problems

3 situations
01 · Problem

Gaps in responsibility at transfers: each contractor has its own leg, and nobody answers for the cargo and timing as a whole.

→ ATF solution

We take the whole route under one contract and through document — one operator is responsible from the port of loading to the door.

02 · Problem

The container is in port but waits weeks for rail dispatch while the carrier runs up detention.

→ ATF solution

We plan the rail dispatch before the vessel arrives, build free time for the whole route into the rate and consider SOC for long inland legs.

03 · Problem

Opaque total cost: rates per leg arrive separately and the door price is unknown in advance.

→ ATF solution

We calculate one through rate to the destination and fix it in the specification before the move starts.

05

Documents

2 blocks

The core document set for multimodal carriage under one contract. The route is covered by a through B/L or FBL, and the inland rail leg by a rail waybill. The final list depends on the scheme, HS code and delivery term.

Incoterms

FOB
you control the whole chain from the port of loading
CIF
the seller pays the sea leg; the inland leg is separate
DAP
delivered at place
DDP
delivered duty paid

Documents

Commercial Invoice
commercial invoice
Packing List
packing list
Through B/L
the carrier's through bill of lading for the whole route
FBL
FIATA multimodal bill of lading issued by the forwarder
Rail waybill
domestic rail waybill for the inland leg
CoO
certificate of origin
06

FAQ

6 questions

Typically 25–35 days: 7–14 days by sea to Vladivostok or Vostochny, 2–7 days for discharge, customs and rail dispatch, and 10–14 days by rail to Moscow. In peak periods the wait for dispatch from the port can be longer.