08Sea container freight· Non-standard cargo

Special containers:

open top, flat rack, platform · out-of-gauge within the platform

  1. Selection
  2. Lashing
  3. Approval
  4. Ocean leg
  5. Delivery

Shipping in open-top and flat-rack containers and on 20' / 40' platforms — for machine tools, oversized crates, coils and pipes, marble slabs, self-propelled and wheeled machinery. The solution for cargo that will not go through a standard container door or is taller than the box but stays within the platform's footprint.

We choose the equipment, calculate lashing and centre of gravity, agree OOG dimensions with the carrier before booking and arrange crane loading. Out-of-gauge cargo needs early booking: such slots are scarce, and the excess dimensions are charged as lost adjacent slots. Ocean freight, port, customs and delivery under single responsibility.

Open top · Flat rackLashing calculationOOG approval
Tell us the route, cargo and container type.
02

Specification

updated 2026-Q1 · form ATF-SEA-SPECEQ-2026

Specification · Special containers. Standard terms · equipment and OOG parameters are confirmed per cargo

Contract

Service type
Special equipment · door-to-door
Equipment
open top · flat rack · platform
Sizes
20' · 40'
Out of gauge
within the platform
Settlement currency
USD · CNY · RUB

Cargo and lashing

Typical cargo
machine tools · pipes · machinery · slabs
Lashing calculation
plan per cargo
CoG and loading
checked
Loading
top / side crane
Survey
as required by the carrier

Transit time

Selection & calculation
2–4 days
OOG carrier approval
3–7 days
Ocean leg
7–14 days from China, longer with transshipment
Transit to Moscow
about 35 days and up
03

Service flow

5 steps
  1. 01

    Choosing the equipment

    Based on the drawing, weight and loading method we choose the type — open top, flat rack or platform — and size, 20' or 40'. We check payload and permitted floor loading.

    1–2 days
  2. 02

    Lashing and CoG calculation

    We prepare a lashing and centre-of-gravity plan for sea loads and carrier requirements, and have it approved by a surveyor where needed.

    1–3 days
  3. 03

    OOG approval and booking

    We submit the out-of-gauge dimensions, weight and lashing plan to the carrier and get OOG approval and a slot. OOG boxes go on the top tier or on deck, so space is limited — we book early.

    3–7 days
  4. 04

    Loading and ocean carriage

    We arrange top or side crane loading, record the lashing with photos and track the voyage end to end.

    7–14 days from China
  5. 05

    Terminal and delivery

    Port discharge with special rigging, customs clearance and delivery by road or rail. If the cargo on the vehicle exceeds 2.55 m width or 4 m height, we obtain a special road permit.

    per route
04

Problems

3 situations
01 · Problem

The cargo does not fit a standard box: people try to squeeze it into a 40HC and lose time on repacking or dismantling.

→ ATF solution

We choose an open top, flat rack or platform to the actual dimensions and crane loading method — no repacking.

02 · Problem

Shifting and damage in transit: cargo lashed 'by eye' moves when the ship rolls.

→ ATF solution

We calculate lashing for sea loads, taking into account the container's lashing-point ratings, record it with photos and have it surveyed if needed.

03 · Problem

Refusal at loading: OOG dimensions were not approved in advance and the box is rejected on cut-off day.

→ ATF solution

We agree dimensions, weight and lashing plan with the carrier before booking and plan the shipment with time to spare.

05

Documents

2 blocks

The core document set for special-equipment shipments and customs release. OOG cargo also needs a drawing with lifting points, a lashing plan and carrier approval; the final list depends on the HS code and delivery term.

Incoterms

FOB
free on board
CFR
cost and freight
CIF
cost, insurance and freight
DAP
delivered at place

Documents

Commercial Invoice
commercial invoice
Packing List
packing list with dimensions, weight and centre of gravity
Cargo drawing
outline drawing with lifting points
Lashing plan
lashing and centre-of-gravity calculation
OOG approval
carrier confirmation of dimensions
B/L
bill of lading
06

FAQ

6 questions

An open top is for cargo that fits the container's width but must be crane-loaded from above or is slightly taller than standard. A flat rack is needed if the cargo exceeds the width or height, or must be loaded from the side. A platform is for the longest and widest pieces, with no end walls.