01International road freight· Full truck

International FTL road freight

A dedicated truck from China, Turkey, Europe and Central Asia

  1. Request
  2. Loading
  3. Border
  4. Customs
  5. Delivery

International full truckload (FTL) road freight means a dedicated truck for one shipment: we load at the shipper, seal the trailer and deliver to the consignee's warehouse under one CMR, with no intermediate warehouses and no co-loading. We run from China, Turkey, Europe, the Caucasus and Central Asia.

Today FTL transit time is decided at the border. For China the road crossings are Zabaikalsk, Pogranichny–Suifenhe, Kraskino–Hunchun, Blagoveshchensk–Heihe, and Khorgos via Kazakhstan. On EU lanes, EU carriers do not enter Russia with cargo and Russian and Belarusian carriers do not enter the EU, so the trailer is swapped or the cargo reloaded near the border. We agree the handover method before loading.

Tell us the route, cargo and container type.
02

Specification

updated 2025-Q4 · form ATF-ROAD-FTL-2025

Specification · Full truckload (FTL). Standard terms · route, crossing and rate are confirmed per shipment

Service

Body
13.6 m tilt, isothermal, reefer
Cargo
up to 20–22 t / 82–92 m³ / 33 euro pallets
Options
insurance, customs, ADR, two temperature zones

Terms

Timing
Europe → Moscow usually 7–14 days; China → Russia depends on the crossing
Documents
CMR and commercial document check included
Currency
USD / RUB

Logistics

Before the border
loading, CMR, export, TIR / T1
At the border
queue, controls, trailer swap or reload
After
customs, delivery, e-waybill, closing documents

Price

Base
rate per truck, door to door
Extras
excess waiting, trailer swap, inspection — as per order
03

Service flow

5 steps
  1. 01

    Request and rate

    We confirm weight, volume, number and size of pallets, stackability, addresses, ready date and delivery term, then choose the body type and border crossing and quote the rate.

    1 day
  2. 02

    Truck placement and loading

    The truck arrives for loading; we check axle distribution and lashing, issue the CMR and seal the body. Photos for every loading.

    1–3 days
  3. 03

    Export and border

    Export clearance in the country of origin, opening TIR or T1 transit, passing the border crossing. On lanes from the EU — trailer swap or reload at a terminal near the border.

    1–3 days at the crossing
  4. 04

    Russian customs

    We file the import declaration (DT) at the destination or border customs, pay duties and VAT and obtain release. If the cargo moves under customs transit, we close the transit on arrival.

    1–3 days
  5. 05

    Delivery to consignee

    Delivery to the consignee's warehouse, unloading confirmed on the CMR. We hand over closing documents; for the domestic leg we issue the Russian waybill, including the electronic one (ETrN via the GIS EPD system).

    1–2 days
04

Problems

3 situations
01 · Problem

After the trip the rate grows by waiting time at loading, a trailer swap at the border and queue time — the invoice goes up after the fact.

→ ATF solution

We fix the rate and the list of possible extras (free waiting time, trailer swap, overnight at the border) in the order before the truck is placed.

02 · Problem

The truck spends a week at the crossing: queue, changed crossing rules, inspection — while the consignee's production stops.

→ ATF solution

We choose the crossing by current load, arrange the trailer swap or reload in advance, track the trip by GPS and report the real ETA, not the planned one.

03 · Problem

Package count and weight in the CMR do not match the invoice and packing list — the truck is held at customs.

→ ATF solution

We reconcile the CMR, invoice and packing list before departure and keep all trip documents in one place, with electronic copies available immediately.

05

Documents

2 blocks

The documents for an international road trip. The delivery term decides who pays for export clearance, waiting time at loading and the leg to the border — settle it in the contract before shipment.

Incoterms

EXW
seller's warehouse; export clearance is on the buyer — arrange who will do it in advance
FCA
seller loads the truck and clears export — a convenient term for FTL
DAP
delivered to the agreed place, import clearance on the buyer
CPT
carriage paid by the seller, risk passes on handover to the first carrier

Documents

CMR
international consignment note signed by shipper, carrier and consignee
Invoice
commercial invoice matching the CMR in description, packages and weight
Packing List
packing list with gross/net weight and package dimensions
Contract
foreign trade contract stating the Incoterms 2020 term
Transit
export declaration in the country of origin, TIR Carnet or T1
06

FAQ

6 questions

Usually when the shipment takes about half a trailer or more (13–16 euro pallets or 6–7 loading metres). At that point the groupage rate per LDM approaches the price of a whole truck, while FTL runs direct with no hub transshipments or waiting for co-loads. We calculate the exact break-even per lane.