Crane hire for oversize cargo

lifting works: mobile and crawler cranes, jacking

  1. Task
  2. Selection
  3. Method statement
  4. Mobilisation
  5. Lift

Hiring a crane to load oversize cargo is not just about the machine but about calculation: the crane must take the load and rigging at the required radius, and the ground must bear the outrigger pressure. We source a mobile or crawler crane from crane companies, prepare the method statement and organise lifting and rigging works in Vladivostok and at client sites.

Work with lifting equipment follows a method statement or work card in line with Rostekhnadzor federal rules. Where there is no room or capacity for a crane, the load is raised with hydraulic jacks and moved along skid tracks (jacking & skidding).

Tell us the route, cargo and container type.
02

Specification

updated 2025-Q4 · form ATF-PROJECT-CRANES-2025

Specification · Crane works. Standard terms · equipment and rate are confirmed once load and site data are received

Service

Equipment
mobile and crawler cranes, hydraulic systems
Works
loading, unloading, placement, rigging
Options
method statement, mats, survey, insurance

Terms

Timing
mobile crane from 1–3 days, heavy crawler longer
Crew
operator, riggers, works supervisor
Currency
RUB

Logistics

Before
selection, method statement, site, permits
On site
mobilisation, lift, photos
After
demobilisation, completion certificate

Price

Base
hourly or per shift, with a minimum order
Extras
mobilisation, crane assembly, mats — separately
03

Service flow

5 steps
  1. 01

    Task and site

    We get the load and rigging weight, dimensions, required radius and lift height, photos and a site sketch: where the crane and vehicle will stand, any nearby power lines and underground services.

    1 day
  2. 02

    Equipment selection

    We select the crane by its load chart: load plus rigging at the required radius, with a margin. If one crane is not enough or there is no room — we consider a tandem lift or jacking & skidding.

    1–3 days
  3. 03

    Method statement and site prep

    We prepare the method statement or work card, calculate ground pressure under the outriggers and choose mats. Near power lines we obtain a permit-to-work, and site passes on restricted premises.

    2–7 days
  4. 04

    Mobilisation

    The crane is delivered to site; heavy crawler cranes arrive in parts on several low-beds and are assembled on site, which is built into the schedule.

    hours to several days
  5. 05

    Lifting operations

    The operator lifts on the supervisor's signals, and certified riggers sling the load per the scheme. The operation is photo-recorded, then the crane demobilises.

    per scope
04

Problems

3 situations
01 · Problem

The crane was ordered by its rated capacity, but at the required radius it lifts several times less — the job fails and the shift is still paid.

→ ATF solution

We select the crane strictly by its load chart for the actual radius and the load plus rigging.

02 · Problem

An outrigger punches through soft ground or a manhole cover — the crane loses stability.

→ ATF solution

We calculate the pressure under each support, choose mats of the right area and check the site for underground services.

03 · Problem

The crane arrives but cannot work: a power line nearby without a permit-to-work, or no method statement — idle time is charged.

→ ATF solution

Method statement, permits and passes are ready before mobilisation, and the crane goes only to a prepared site.

05

Documents

2 blocks

Documents without which the crane will not start work on site. The delivery term decides who hires the crane for loading and unloading — better to know before the cargo is ready to ship.

Incoterms

EXW
the buyer arranges loading at the seller's site, including the crane
FCA
the seller loads onto the buyer's vehicle at its premises
DPU
the seller is also responsible for unloading at destination

Documents

Method statement
crane set-up, rigging and load path scheme
Crane documents
passport and periodic inspection record
Certificates of competence
operator, riggers, person in charge
Rigging certificates
for spreaders, slings and shackles
Permit-to-work
when working within a power-line safety zone
06

FAQ

6 questions

Yes, the crane always works with its own operator, and we arrange riggers and a works supervisor as part of the crew. You get a ready-to-work team with the required certificates, not just a machine. Rigging gear is selected separately for the load.