Heavy-lift shipping

heavy-lift vessels, floating cranes, tandem lifts

  1. Data
  2. Vessel & cranes
  3. Lift plan
  4. Lift
  5. Discharge

Shipping super-heavy cargo is above all about the lift: a unit weighing hundreds of tonnes must be taken off the quay, placed on the vessel and discharged onto transport. We find a heavy-lift vessel with its own cranes or bring in a floating crane and heavy shore cranes, prepare the lift plan and manage the operation until the cargo sits on the axles.

Heavy-lift vessels work their own cranes in tandem, so they lift more than any single crane on board. During the lift the vessel counters the heel with ballast, so the operation is planned with the master and for a specific weather window.

Tell us the route, cargo and container type.
02

Specification

updated 2025-Q4 · form ATF-PROJECT-HEAVYLIFT-2025

Specification · Heavy-lift. Standard terms · lift scheme and equipment are confirmed per unit

Service

Cargo
units from tens to hundreds of tonnes
Equipment
heavy-lift vessel, floating crane, shore crane
Options
survey, insurance, on-carriage on axles

Terms

Preparation
typically 2–6 weeks before the lift
Documents
lift plan and rigging certificates included
Currency
USD / RUB

Logistics

Before
data, crane selection, lift plan
Lift
loading, sea fastening, survey
After
discharge onto axles, low-bed or barge

Price

Base
freight or crane hire + engineering
Extras
weather downtime, extra rigging — at cost
03

Service flow

5 steps
  1. 01

    Input data

    We obtain the manufacturer's drawing with weight, dimensions, centre of gravity and lifting points and check that the lugs are rated for the lift. We choose the scheme: ship's cranes, floating crane or shore crane.

    2–5 days
  2. 02

    Vessel and cranes

    We find a heavy-lift vessel whose own cranes in tandem take the unit weight with a margin, or a floating crane in port. We check radius, load moment and allowable quay loading.

    1–3 weeks
  3. 03

    Lift plan

    We develop the lift plan: rigging scheme, certified spreaders and slings, load split between cranes, operation sequence, wind and sea-state limits. It is approved by the master and the lift supervisor.

    1–2 weeks
  4. 04

    Lift and sea fastening

    The unit is lifted within the weather window while the vessel compensates heel with ballast. It is set on cradles and secured to the deck, usually with welded stoppers (sea fastening). The surveyor records every step.

    1–2 days
  5. 05

    Discharge onto transport

    At the destination port the unit is lifted off the vessel directly onto hydraulic axles, a low-bed or a barge — without intermediate storage where the schedule and quay allow.

    1–3 days
04

Problems

3 situations
01 · Problem

The manufacturer has not supplied a drawing with the centre of gravity, and the lugs are not rated for lifting the assembled unit — the master refuses the lift.

→ ATF solution

We request the drawing and lug calculation while the unit is still in production; if unavailable, we design a scheme with a spreader and basket slings.

02 · Problem

The quay cannot take the load of the crane or the loaded trailer.

→ ATF solution

We obtain the allowable quay load in advance, spread the pressure with mats or work with a floating crane from the water side.

03 · Problem

Wind closes the lift window, and idle time of the vessel and floating crane is chargeable.

→ ATF solution

We build weather limits and back-up dates into the plan and fix idle-time terms in the contracts before work starts.

05

Documents

2 blocks

Documents for lifting and shipping a super-heavy unit. Without a drawing showing the centre of gravity and certificates for the rigging, neither the master nor the lift supervisor will approve the operation.

Incoterms

FOB
loading on board is on the seller; agree in advance whose crane is used and who pays for the lift
CIF
freight and insurance to the destination port are on the seller
DAP
unloading at destination is on the buyer and must be planned separately

Documents

Unit drawing
dimensions, weight, centre of gravity, lifting points
Rigging certificates
for spreaders, slings, shackles and lifting lugs
Lift Plan
lift scheme approved by the master or works manager
B/L / charter
heavy-lift B/L or charter party
Invoice & Packing List
for customs and insurance
06

FAQ

6 questions

The limit is set by the cranes and deck strength: heavy-lift vessels lift hundreds of tonnes in tandem, the largest over a thousand. We handle units from tens to hundreds of tonnes and match the crane by radius and load moment to the actual weight. If ship's cranes are not enough, a floating crane is brought in.