Industrial equipment transport is about integrity as much as delivery: a machine tool, transformer or turbine must arrive free of shocks, corrosion and breaches of factory limits, or the manufacturer voids the warranty. We manage the equipment from factory packing to foundation set-down.

Machine tools and production lines from China usually ship in container lots, with large assemblies on open tops, flat racks or breakbulk. Power transformers travel without oil under nitrogen or dry-air overpressure, and the pressure is monitored all the way.

Tell us the route, cargo and container type.
02

Specification

updated 2025-Q4 · form ATF-PROJECT-EQUIPMENT-2025

Specification · Industrial equipment. Standard terms · scheme and timing are confirmed after reviewing the specification and manufacturer requirements

Service

Equipment
machine tools, lines, transformers, turbines, reactors
Scope
factory to foundation
Options
packing, survey, insurance, customs

Terms

Timing
Shanghai–Vladivostok by sea usually 7–12 days + customs and delivery
Monitoring
shock & tilt, gas pressure included
Currency
USD / RUB

Logistics

At the factory
packing, recorders, loading
In transit
sea, customs, transshipment
On site
unloading, upending, foundation

Price

Base
transport per agreed scheme
Extras
site rigging, storage, installation supervision — on request
03

Service flow

5 steps
  1. 01

    Data and requirements

    We collect the specification and packing list with package drawings, the manufacturer's shock, tilt and preservation requirements, and the site installation schedule.

    2–5 days
  2. 02

    Transport scheme

    We choose the scheme: containers including open top and flat rack, breakbulk or heavy-lift, rail or low-bed; for a line — a shipping plan in lots matched to the installation sequence.

    3–7 days
  3. 03

    Packing and loading

    We check packing and preservation at the factory, fit shock and tilt recorders and secure to plan; a surveyor records the condition before dispatch.

    1–5 days
  4. 04

    Transit and customs

    Sea leg to Vladivostok or Vostochny, customs clearance: HS classification, conformity documents and, where eligible, the VAT exemption for technological equipment.

    1–3 weeks
  5. 05

    Delivery and set-down

    We deliver to site by low-bed or axles, unload, upend and set on the foundation to a method statement with axis setting-out by a surveyor. Recorder data is handed to the client.

    2–10 days
04

Problems

3 situations
01 · Problem

The line arrives in twenty lots, and customs classifies each package separately — different codes, duties and permits.

→ ATF solution

We prepare one specification for the whole set and settle in advance the classification of goods imported unassembled in several lots.

02 · Problem

The recorder shows a shock above the limit, or the transformer loses gas pressure — the manufacturer questions the warranty.

→ ATF solution

We hold speed and handling to the method statement, monitor pressure en route and top up gas and notify the manufacturer immediately on any deviation.

03 · Problem

A machine tool corrodes during the sea voyage: condensation in the container and weak preservation.

→ ATF solution

We require preservation and anti-corrosion film with desiccant and check the packing before shipment.

05

Documents

2 blocks

Documents for moving and importing equipment. If a line ships in several lots, the specification should cover the whole set in one document — it simplifies customs classification.

Incoterms

FCA
the seller loads at the factory — packing and securing should be specified in the contract
CIP
the seller pays carriage and insures on extended cover
DAP / DPU
delivery to site; under DPU the seller also unloads

Documents

Invoice & specification
broken down by package and assembly, with models and serial numbers
Packing List
dimensions, weight, CoG and storage conditions of each package
Conformity documents
under TR CU 010/2011 and, where applicable, 004/2011 and 020/2011
Manufacturer requirements
allowable shock and tilt, preservation, lifting points
Recorder data
shock & tilt download after delivery
Contract
with the delivery term and supervision-of-installation terms
06

FAQ

6 questions

Equipment travels on cushioned hydraulic axles or low-beds, with shock and tilt recorders fitted to the unit, and speed is held to the method statement. After delivery the recorder data confirms that factory limits were not exceeded. If there was an impact it shows immediately, and the manufacturer can inspect before installation.